    The continuing storms have caused extensive flooding in many areas of the UK. If your weighbridge has been submerged at any time then it’s vital to have it checked out to prevent future problems occurring.

     

    Weightron-Minimising-Flood-Damage-to-Weighbridges

    Pit weighbridges

    This is especially important for pit weighbridges. Junction boxes, cabling, load cells and mounting assemblies can be particularly vulnerable to flooding, especially if non-welded, potted load cells are fitted.

    Internal structure

    A well-designed weighbridge system fitted with stainless steel IP69K sealed load cells should not be adversely affected by flooding, but build-up of mud and debris around the load cells can affect performance and reduce the effectiveness of any integral lightning protection.

    Speak to the experts

    Although the user can carry out a number of checks themselves, such as ensuring essential drainage systems have not become blocked, the best policy is to employ a qualified weighbridge expert who can check all essential components and clean load cell assemblies without causing damage. Such companies can also check electrical integrity and cabling, whilst ensuring any peripheral equipment such as automatic traffic barriers have not been affected.

    Weightron Bilanciai are offering a free site inspection during February 2016 to check out your weighbridge. To book your no-obligation visit please contact us.

    Contact us

      Upload Your CV Below. We Accept The Following File Types: PNG, JPG/JPEG, PDF & DOC/DOCX. Max File Size: 32MB

      Frequently Asked Questions

      What is a Weighbridge?

      A Weighbridge (US truck scale) is a large, low-profile scale used to weigh both road and off-road vehicles (rigid and articulated lorries, dumper trucks, vans etc) and their contents. The load carried by the vehicle is calculated by weighing the vehicle both empty and loaded. The main weighbridge deck structure can be constructed from steel, pre-stressed concrete or steel-concrete composite.

      What is a Pit-Mounted Weighbridge?

      Installed inside a pit, these weighbridges sit flush with the road surface. As they don’t require ramps, they take up less road surface compared to surface mount installations. Suitable for sites with restricted access.

      What is a Surface-Mounted Weighbridge?

      Installed above ground, these weighbridges incorporate steel or concrete ramps to allow vehicles to drive on and off. One advantage is that the ramps slow down vehicle entry speed. Less foundation works are required when compared with pit mount installations. Surface designs are suitable for temporary/portable installations when used with steel ramps.